Construction and detailed project prepared by architect onur yaser can, havelsan building project work began the end of 2008.
In the preliminary project stage, onur yaser can had started to work with us in “optima proje geliştirme ve yönetim ltd. Şti.” And exhibited a highly successful work to find out the relations in laboratory spaces which are the corner stones of the building, as well as to reveal a modern and aesthetic design according to the demands of the administration
Architectural construction projects of the 5500 m2 construction area having havelsan building completed in june 2009, and three-dimensional images prepared by onur that constitutes a good perception for the building from inside and outside has gained great appreciation from the administration
Construction of the building started in a short time and built in accordance with the design of onur yaser can and completed in 2010